Pass SAP Certified Application Associate C_TS422_2020 exam [Jan 23, 2022] Updated 82 Questions [Q13-Q33]

Share

Pass SAP Certified Application Associate C_TS422_2020 exam [Jan 23, 2022] Updated 82 Questions

SAP C_TS422_2020 Actual Questions and 100% Cover Real Exam Questions

NEW QUESTION 13
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Functional Location BOM
  • B. Class BOM
  • C. Work Center BOM
  • D. Sales Order BOM

Answer: A,D

 

NEW QUESTION 14
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.

  • A. Plant
  • B. Work center
  • C. Material
  • D. Production version

Answer: B,C

 

NEW QUESTION 15
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. By industry
  • B. By period
  • C. By material type
  • D. By plant

Answer: B,D

 

NEW QUESTION 16
How can SAP S/4HANA support a GMP compliant production process? Note: There are 3 correct answers tothis question.

  • A. Recipe approval (with Engineering Change Management)
  • B. Predefined GMP compliant process order types to meet audit requirements
  • C. Use of the GMP compliant flag in relevant master data applications
  • D. Documentation of quality data with Quality Management
  • E. Use of the digital signature function to check and run business processes

Answer: A,D,E

 

NEW QUESTION 17
Which time elements does MRP consider in backward scheduling to determine the order dates for components from dependent requirements? Note:There are 2 correct answers to this question.

  • A. Planned delivery time
  • B. Operation duration
  • C. Total replenishment lead time
  • D. In-house production time

Answer: A,D

 

NEW QUESTION 18
In which data objects do you maintain the production line as the work center forrepetitive manufacturing?
Note: There are 2 correct answers to this question.

  • A. Repetitive manufacturing profile
  • B. Production version
  • C. Routing
  • D. Production cost collector

Answer: B,C

 

NEW QUESTION 19
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. To determine the work in progress along the production line
  • B. To stage different components for a production line simultaneously
  • C. To provide timely updates of inventory management for the staged components
  • D. To reduce the totalproduction lead time for along production line

Answer: A,C

 

NEW QUESTION 20
You use planning strategy Finite Scheduling - with Reverse and want to allow scheduling in the past. How can you achieve this?

  • A. Specify a negative planning horizon in the strategy profile.
  • B. Specify a positive offset time in the strategy profile.
  • C. Specify a negative offset time in the strategy profile.
  • D. Specify a positive planning horizon in the strategy profile.

Answer: C

 

NEW QUESTION 21
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.

  • A. Past procurement quantities
  • B. Past quotation quantities
  • C. One-off events
  • D. Market intelligence
  • E. Past sales order quantities

Answer: C,D,E

 

NEW QUESTION 22
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?

  • A. Scheduling working time only
  • B. Squeezing
  • C. Insert operation
  • D. Find Slot

Answer: D

 

NEW QUESTION 23
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

  • A. Posting of production costs to the production cost collector
  • B. Archiving of documents for assembly scrap
  • C. Posting of goods receipt for the product
  • D. Reduction of associated capacity requirements
  • E. Material staging for next order in sequence

Answer: A,C,D

 

NEW QUESTION 24
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?

  • A. Plant Data
  • B. MRP Profile
  • C. MRP Controller
  • D. MRP Group

Answer: D

 

NEW QUESTION 25
What does the industry sector determine? Note: There are 2 correct answers to this question.

  • A. Whether material numbers are assigned internally or externally
  • B. Whether a material master fieldis required, changeable, displayed, or hidden
  • C. Which transaction you can use to create a new material
  • D. Which material master views can be maintained

Answer: B,D

 

NEW QUESTION 26
Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.

  • A. Implementation
  • B. Planning
  • C. Engineering change management
  • D. Inspection during production

Answer: A,B

 

NEW QUESTION 27
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.

  • A. SAP SuccessFactors
  • B. SAP Ariba
  • C. SAP Concur
  • D. SAP Field glass
  • E. SAP C/4HANA

Answer: B,C,D

 

NEW QUESTION 28
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP"/OS)?

  • A. Use a planning group.
  • B. Use a resource group.
  • C. Use a heuristic.
  • D. Use a propagation range.

Answer: C

 

NEW QUESTION 29
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are2 correct answers to this question.

  • A. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
  • B. In Customizing you can decide by material type whether to use the long material number.
  • C. The display template for material numbers applies to all clients.
  • D. The number of leading zeros for internal numbers is client-specific.

Answer: A,C

 

NEW QUESTION 30
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

  • A. To make the assignment of components easier
  • B. To reduce the number of changes required in bills of material
  • C. To increase the number of planning levels
  • D. Tosimplify the structure of bills of material
  • E. To reduce the number of material masters

Answer: A,B,D

 

NEW QUESTION 31
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?

  • A. When you create a sales order
  • B. When the MRP results are saved
  • C. When you deliver a sales order
  • D. When you create a planned order

Answer: A

 

NEW QUESTION 32
If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?

  • A. Minimum wait time
  • B. Production time
  • C. Goods receipt processing time
  • D. Queue time

Answer: D

 

NEW QUESTION 33
......

SAP C_TS422_2020 Real 2022 Braindumps Mock Exam Dumps: https://passking.actualtorrent.com/C_TS422_2020-exam-guide-torrent.html