Pass Your Exam With 100% Verified E-S4HCON2022 Exam Questions [Q20-Q42]

Share

Pass Your Exam With 100% Verified E-S4HCON2022 Exam Questions

E-S4HCON2022 Dumps PDF - E-S4HCON2022 Real Exam Questions Answers


To prepare for the SAP E_S4HCON2022 certification exam, candidates must have a thorough understanding of SAP S/4HANA system architecture and the various migration strategies. They must also have experience working with SAP system upgrades and be familiar with the latest tools and methodologies used in this field. Additionally, candidates must be able to plan and manage complex projects and have excellent communication and stakeholder management skills.

 

NEW QUESTION # 20
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA.
What do you need to consider? Note: there are 2 correct answers to this question.

  • A. SAP HANA Landscape Reorganization required a manual step to edit a file.
  • B. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • C. Network capacity between exporting and importing R3load processes must be.
  • D. The target database size increases temporarily because of the Shadow Repository.
  • E. The source system is non-Unicode and the target database is a scale-out system.

Answer: A,B


NEW QUESTION # 21
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.

  • A. Conversion
  • B. Main import
  • C. Software update
  • D. Migration

Answer: A,D


NEW QUESTION # 22
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

  • A. SAP HANA Landscape Reorganization required a manual step to edit a file.
  • B. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
  • C. Network capacity between exporting and importing R3load processes must be.
  • D. The target database size increases temporarily because of the Shadow Repository.
  • E. The source system is non-Unicode and the target database is a scale-out system.

Answer: A,B


NEW QUESTION # 23
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?

  • A. The benchmaking option allows you to migration a specified set of tables
  • B. The benchmaking option allows you to repeat the uptime migration
  • C. The repetition option allows you to repeat the complete migration
  • D. The repetition option allows you to run the migration without a shadow system

Answer: A


NEW QUESTION # 24
You are running an SAP ECC system. For which of the following activities does SUM allow you to use the Near Zero Downtime Maintenance (NZDM) capabilities?
There are 3 correct answers to this question.
Response:

  • A. Perform an SAP S/4HANA conversion including DMO.
  • B. Use DMO for SUM.
  • C. Apply SAP Support Packages.
  • D. Upgrade the SAP system.
  • E. Apply an Enhancement Package.

Answer: C,D,E


NEW QUESTION # 25
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:

  • A. Uptime migration (EU_CLONE_MIG_UT_RUN)
  • B. Shadow repository creation (EU_IMPORT*)
  • C. Downtime migration (EU_CLONE_MIG_DT_RUN)
  • D. ParaUel distribution (PARDIST_SHD)

Answer: A


NEW QUESTION # 26
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:

  • A. SUM without DMO
  • B. SWPM using the Backup / Restore procedure
  • C. SUM with DMO
  • D. SWPM using the Load procedure

Answer: D


NEW QUESTION # 27
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

  • A. Database migration
  • B. Support Package Stack update
  • C. Dual Stack split
  • D. Homogenous system copy
  • E. Release upgrade

Answer: A,B,E


NEW QUESTION # 28
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

  • A. In Process Control Center
  • B. In SUM Parameters
  • C. In DMO Migration Preparation
  • D. In SUM Phaselist

Answer: A,B


NEW QUESTION # 29
You are performing an SAP S/4HANA conversion. When does the silent data migration (SDM) take place?

  • A. During the SUM technical downtime
  • B. Before the start of the SUM technical downtime
  • C. During the Execution roadmap step
  • D. After SUM has ended

Answer: A


NEW QUESTION # 30
Unicode migration ECC on MaxDB to HANA in scale out what should we consider.

  • A. A
  • B. DMO can only be run with systems NW740 or NW731
  • C. Target DB size will increase temporarily

Answer: B,C


NEW QUESTION # 31
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:

  • A. A change of the database type is performed, without changing the software components.
  • B. An upgrade of the software components is performed, without changing the database type.
  • C. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
  • D. An SAP S/4HANA conversion is performed, without adapting the customer data.

Answer: A


NEW QUESTION # 32
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:

  • A. Check the messages shown by the SUM UI
  • B. Check the most recent entries in SAPup.log
  • C. Check the most recent entries shown in file sapevt.trc
  • D. Check the system log (transaction SM21) of the SAP system

Answer: A,B


NEW QUESTION # 33
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. An additional temporary database is used during uptime
  • B. Dedicated application tables are migrated in uptime
  • C. The repository is migrated in uptime
  • D. TABIMJJPG is executed in uptime

Answer: B


NEW QUESTION # 34
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:

  • A. Import of dictionary objects from the download directory in phase DDIC_UPG
  • B. Import of upgrade and language data from the download directory in phase TABIM UPG
  • C. Activation of dictionary objects in phase ACT_UPG
  • D. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
  • E. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE

Answer: A,B,C


NEW QUESTION # 35
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:

  • A. Phases DIFF*
  • B. Phases EU_IMPORT*
  • C. Phase DOWNCONF_DTTRANS
  • D. Phase RUN_RSPTBFIL _ISUTABU
  • E. Phase RUN_RSDBSCPY

Answer: A,B,C


NEW QUESTION # 36
During a SUM run you want to check if the phase SHADOW_IMPORT_INC is still running properly. Where can you find information about this?
There are 2 correct answers to this question.
Response:

  • A. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
  • B. Check for running batch jobs in the shadow system via Job Overview (SM37)
  • C. Check for running R31oad processes on the host of the primary application server
  • D. Check for running R3trans processes on the host of the primary application server

Answer: A,D


NEW QUESTION # 37
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answers to this question.

  • A. It explains where to find information about the custom code analysis.
  • B. It is a database-specific document.
  • C. It contains a section about the simplification item (SI) checks.
  • D. It explains the database migration option (DMO) of SUM.

Answer: A,C


NEW QUESTION # 38
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:

  • A. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
  • B. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.
  • C. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
  • D. These are 40 pairs of R3load processes, so there are 80 R3load processes running.

Answer: D


NEW QUESTION # 39
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

  • A. Kernel for target release, Linux, SAP HANA
  • B. Kernel for source release, Windows, SAP MaxDB
  • C. Kernel for target release, Windows, SAP HANA
  • D. Kernel for target release, Windows, SAP MaxDB

Answer: B,C


NEW QUESTION # 40
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:

  • A. It is a database-specific document
  • B. It is target release specific
  • C. It contains a section "free space requirements"
  • D. It contains a troubleshooting section

Answer: B,C


NEW QUESTION # 41
You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?

  • A. The SAP support packages contained in the upgrade media, calculated by the maintenance planner
  • B. The SAP support packages that will be bound to the conversion
  • C. The SAP support packages of the support package stack, calculated by the maintenance planner
  • D. The SAP support packages in the download directory that are newer than the selected support package stack

Answer: D


NEW QUESTION # 42
......


The SAP E-S4HCON2022 certification is a valuable credential that demonstrates the candidate's expertise in SAP S/4HANA conversion and upgrade projects. The certification helps candidates to enhance their career prospects and opens up new job opportunities. The certification also helps candidates to showcase their skills to potential employers and clients. Additionally, the certification helps organizations to identify and hire qualified professionals who can manage SAP S/4HANA conversion and upgrade projects successfully.

 

E-S4HCON2022 Dumps 100 Pass Guarantee With Latest Demo: https://passking.actualtorrent.com/E-S4HCON2022-exam-guide-torrent.html