
Verified & Correct HQT-4180 Practice Test Reliable Source May 06, 2023 Updated
Free Hitachi HQT-4180 Exam Files Downloaded Instantly
Hitachi HQT-4180 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
NEW QUESTION 15
Which two actions can be performed with Hitachi Ops Center Administrator? (Choose two.)
- A. Configure the Hitachi Remote Ops Monitor Agent.
- B. Manage virtual storage machines.
- C. Manage multiple VSP Midrange storage systems.
- D. Perform Self-Service Maintenance.
Answer: A,D
NEW QUESTION 16
Which tool do you use to install license keys on a VSP G370 system?
- A. Maintenance Utility
- B. HSA Embedded
- C. MPC Software
- D. Storage Navigator
Answer: A
NEW QUESTION 17
One Unix server and one Windows server share the front-end ports CL1-A and CL2-A of a VSP E590 system.
What are two requirements to separate the I/Os of the servers? (Choose two.)
- A. Two cache partitions must be created on the VSP for the servers.
- B. The Universal Volume Manager license must be installed.
- C. Both servers must be registered in two different Host Groups.
- D. Port security must be enabled on both ports.
Answer: C,D
NEW QUESTION 18
A customer has a VSP G370 with the encryption license key installed. They now want to have all the DP-Volumes of a certain pool located on encrypted RAID Groups.
What are two requirements? (Choose two.)
- A. The RAID level of RAID Groups in the pool must be RAID 6.
- B. The RAID Groups in the pool must be formatted with encryption enabled.
- C. At least 20 GB of Shared Memory must be installed.
- D. The controller board must support encryption.
Answer: B,D
NEW QUESTION 19
A customer wants to upgrade a VSP G700 to 512 GB RAM capacity.
What is the valid CFM configuration?
- A. two BM35 per controller
- B. two BM35 per system
- C. one BM45 per controller
- D. two BM45 per controller
Answer: D
NEW QUESTION 20
A customer wants to change a production RAID group from RAID 5 (7D+1P) to RAID 6 (6D+2P) on a VSP G600 during normal operations. They have just unmapped the LUNs from the channel ports.
What needs to be performed next?
- A. The RAID level in the SVP Maintenance window must be changed.
- B. Parity groups must be deleted.
- C. The RAID 5 group must be put into DRU mode in Storage Navigator.
- D. The RAID level must be changed in Storage Navigator.
Answer: B
NEW QUESTION 21
You need to replace a broken disk drive on a VSP G700.
What are two prerequisites? (Choose two.)
- A. The Drive Box where the drive is located must be powered down.
- B. The red LED on the drive must be lit.
- C. You must wear a wrist strap for ESD protection.
- D. You must use the Replace button in the Maintenance Utility before removing the drive.
Answer: C,D
NEW QUESTION 22
What is the maximum size of a basic volume carved out from an internal parity group on a VSP E590 system?
- A. 1 TB
- B. 65 TB
- C. 128 TB
- D. 2.99 TB
Answer: D
NEW QUESTION 23
Which manual should be used when performing maintenance actions on VSP midrange storage systems?
- A. Product Documentation Library
- B. Administrator Guide
- C. Service Guide
- D. Maintenance Manual
Answer: D
NEW QUESTION 24
Which tool monitors a VSP E590 system and reports System Information Messages (SIMs)?
- A. Hitachi Remote Ops SVP Agent
- B. Hitachi Ops Center Protector
- C. Storage Navigator
- D. Hitachi Remote Ops Monitor Agent
Answer: B
NEW QUESTION 25
Your customer wants to connect multiple servers to a new port on a VSP G700. The correct topology has already been set for the port.
What should you do next?
- A. Create a Host Group.
- B. Scan for all WWNs.
- C. Enable Port Security.
- D. Enable Host Group security.
Answer: B
NEW QUESTION 26
The SVP of a VSP G900 system failed and you have been asked to replace it.
Which two items must be available to perform the replacement? (Choose two.)
- A. the microcode iso file with the correct software versions
- B. the iso file with the correct version of the Windows operating system
- C. the Hitachi Remote Ops Monitor Agent iso file
- D. the iso file with the correct version of Hitachi Ops Center
Answer: A,D
NEW QUESTION 27
What is the recommended RAID level when creating a Hitachi Dynamic Provisioning (HDP) pool?
- A. RAID 6
- B. RAID 5
- C. RAID 1+0
- D. RAID 1
Answer: C
NEW QUESTION 28
Which program is used to perform the "New Installation" procedure on a VSP F700 system?
- A. MPC connected to the maintenance LAN port
- B. raidcom CLI
- C. Hitachi Ops Center Administrator
- D. SVP Web console
Answer: C
NEW QUESTION 29
......
Pass Hitachi HQT-4180 exam Dumps 100 Pass Guarantee With Latest Demo: https://passking.actualtorrent.com/HQT-4180-exam-guide-torrent.html